Showing posts with label BPAC. Show all posts
Showing posts with label BPAC. Show all posts

Thursday, March 1, 2018

BikeWalkLee's Letter to County Commissioners in Support of 100% Impact Fees


 On Tuesday, March 6th, the County Commissioners will be considering whether impact fees should return to the 100% rate or continue its impact fee reduction policies, which has resulted in the loss of $83 million in revenues over the past 5 years.  BikeWalkLee strongly supports returning to the 100% impact fees and has shared our comments with Commissioners.  Make your voices heard before or at this important meeting on Tuesday. Here's the Link to this Letter.





March 1, 2018

Lee County Board of Commissioners
2120 SW Main Street
Fort Myers, FL 33901

Dear Commissioners: 
BikeWalkLee, a coalition working to complete Lee County's streets, works for a more balanced multi-modal transportation system that values transportation choice, connectivity, economic opportunity, livable communities, community character, safety, and quality growth.  Over the past six years, we have steadfastly opposed the suspension or reduction in impact fees.  We believe that providing public infrastructure should be a shared responsibility; that investments in public infrastructure necessitated by growth should be paid for by those creating that need;  and that infrastructure investments should keep pace with permitted development so that the quality of life for all residents does not erode as a result.

At your March 6 Board meeting, we urge you:

·        To take no action to extend reduced impact fees, so that the full base rate (100%) is automatically reinstated effective March 16, 2018, as called for in your March 2015 ordinance;

·        To adopt the recommendations in the 2018 Duncan Associates impact fee studies (roads, schools, parks, fire/EMS), updating the 100% rates reflecting current costs;

·        To oppose any efforts to lengthen the impact fee update cycle beyond the current long-standing practice of updating the fees on a three-year cycle. 

When the Board enacted the reduced collection rate (20% for two years) in 2013, and then extended it in 2015 (with a reduced collection rate of 45% for three years), the ordinances stated that these reductions were to provide temporary relief to the building and construction industry in recognition of the downturn in the U.S. economy. The downturn in the economy is long over, with employment and growth booming in Lee County, and it's past time for the "temporary relief" to come to an end.
This "temporary relief" has come at a high cost to the taxpayers. As a result of this Board's policy decisions (supported by all Board members with the exception of Commissioner Mann) to reduce impact fee collection rates over the past five years, $83 million in revenues has been lost (approximately half for roads as well as parks; and the other half for schools). Public infrastructure costs due to permitted development are determined by state-mandated impact fee studies which establish the base impact fees. According to these studies (e.g. Duncan Update studies), $128 million is necessary to cover the public infrastructure costs associated with these developments, yet the county collected only $45 million of that amount, creating a $83 million unfunded liability for the taxpayers of Lee County. [See Attachment 1.]
Now the Board is considering a proposal to extend this 45% collection rate for another five years, which would result in an additional estimated loss of $122 million ($24 million a year), bringing the 10-year revenue loss to over $200 million (half for schools and other half for roads and parks). [See Attachment 2.]  If this 45% collection rate becomes permanent (as the majority of the Commission clearly intends), by 2040, the County will have lost an additional $400 million in revenue...for a grand total of $600 million (half for schools and half for roads and parks)! It is fiscally irresponsible of the Board to give away a vital revenue source necessary to meet the public infrastructure needs of this growing county, even more so because no replacement revenue sources have been put in place to cover these costs. 

During the 24 years from when road impact fees were instituted (FY 1990 through FY 2013, when slashing of impact fees began), this revenue source constituted about one-third of all revenues funding transportation projects. As a result of the Board's impact fee reduction policy decisions over the past five years, that share has dropped from 36% to 10%. It is time to re-assert the community compact of shared responsibility that served the county well for the previous 24 years, and return impact fees to 100% of the base rate. [See Attachment 3.]

In addition to the detrimental impacts from the past five years' $83 million revenue loss, there has been an even more lasting casualty: In the Board's attempt to justify slashing impact fees, it has created a false narrative that there are sufficient revenues to meet the transportation needs of this growing community. Nothing could be further from the truth. 

The countywide long range transportation plan (2040 LRTP) approved in 2015 by the MPO Board (consisting of all 5 Commissioners along with elected officials from each of the 6 municipalities), clearly sounded the alarm about the growing transportation funding shortfall. Less than half of the projects in the approved list can be funded with the estimated revenues coming in through 2040. For the LRTP projects that are solely the responsibility of Lee County, there is a $1.2 billion shortfall over the next 22 years, with 55% of the need left unfunded. This is half of the $2.3 billion shortfall  in the overall Plan. Furthermore, as the MPO's LRTP made clear, the upward pressure on project costs coupled with worsening downward trends on almost all revenue sources, the transportation funding shortfall with be significantly higher when the 2045 LRTP is adopted in 2019. [See Attachment 4.]  

The County Administration has argued that it has "solved" the funding shortfall problem with its Growth Increment Fund (GIF).  This is not true.  First, no new revenues have been raised.  GIF simply shifts approximately $11 million/year in already collected property tax revenues (from all residents) to the transportation CIP every year; thereby shifting who is paying for this infrastructure.  Second and most importantly,  even with these GIF revenues, the funding shortfall has only been reduced to $864 million-- with  41% of the funding shortfall remaining.  

Restoring impact fees to 100% will make a big dent in the shortfall (closing half of the gap), but the County will still be faced with  a remaining 23% funding shortfall ($481 million).  As has been discussed by the MPO, new revenue sources are needed and it is the responsibility of local leaders to come up with solutions; yet nothing has been done. Through its actions to reduce impact fee revenue collections, this Board has made an already dire funding situation much worse. [See Attachment  5.]

The Board's exclusive focus on the Transportation CIP's five-year window is very deceptive. In order to create the impression that no additional funds are needed, it simply pushes the true costs of completing these projects into the outyears beyond the "visible" five-year window, hiding the fact that sufficient revenues are not available to complete these projects. 

Using the County's own numbers--the FY 2017-18 5-Year Transportation CIP (adopted in Sept. 2017)and its revenue estimates (provided in Feb. 6, 2018 workshop), just to complete construction of the projects already underway in the current 5-year CIP (totaling $244 million) an additional $225 million is needed, as shown the County's "6-10 year" column on its detailed CIP spreadsheet. This means that over 80% of the revenues coming in for the next 5-year window (FY 22/23-26/27) are already committed for the completion of the projects now underway.  Only $55 million will be available to spend on all the unfunded Tier II and III projects, which have a $165 million price tag.

The reality is that it will take over 15 years to fund all the projects in the current five-year CIP and on the county's approved Tier I, II, and III priorities list.  No funds will be available for any new projects until  FY 2032/33 -- 14 years from now, by which time Lee County will have another 182,000 residents on top of our current population of 700,000. [See Attachment 6.]

In addition to these "big picture" transportation funding concerns, BikeWalkLee is particularly concerned about the consequences of this funding shortfall on the growing backlog of stand-alone bike/ped retrofit projects, as well as road projects that incorporate a complete streets approach. In 2017, Lee County was ranked the deadliest metro area in the country for pedestrian safety. [The 2016 Dangerous by Design report released by Smart Growth America.] This report demonstrated the urgent need for increased investment in pedestrian and cyclist infrastructure to make Lee County roadways safer for all users. A year ago, BikeWalkLee challenged the County along with the six local municipalities, to step up their investments to make our roadways safer for everyone. Without these additional investments now, we are likely to see our "worst in the country" label stick when the next report comes out next year, hurting Lee County's reputation well beyond this one issue. Safety is essential to one's quality of life, and without it, our economic vitality cannot be sustained. 

While the County has provided some increased funding for bike/ped projects, much more needs to be done. As of January 2018, there are $105 million in bike/ped stand-alone projects that have been approved and prioritized by the County's Bicycle Pedestrian Advisory Committee waiting to be funded. In addition, there are $38 million more in approved projects that are currently on hold until other issues are resolved.  The list of approved projects has grown from $68 million in FY 2015, essentially doubling over the past 3 years. To eliminate this backlog, and to make our existing roadways  safer for pedestrians and cyclists, significant additional revenues are needed in the transportation budget over the next 15 years and beyond. [See Attachment  7.] 
The Board needs to be honest with the citizens of Lee County about the growing transportation funding shortfall rather than pretending it doesn't exist so the Board can squander much needed revenues by only collecting a fraction of impact fees due to the county and school district. The Board's actions on this critical issue over the past five years have misled the public about the true transportation funding situation and undermined the long-standing social compact of "shared sacrifices" that is critical to the public's trust in its elected officials, making it even harder to gain public support for these efforts in the future.
Economic prosperity comes from quality investments in community infrastructure. We urge you to vote to return impact fees to the full 100% rate, as updated by the 2018 Duncan impact fee update studies. 

Sincerely, 

Darla Letourneau
On behalf of
BikeWalkLee

cc: Roger Desjarlais, County Manager

Attachments:




Attachment  4:  Lee County/BoCC Approved Projects in 2040 LRTP





Wednesday, December 21, 2016

BWL Column: Patience pays off for Fiddlesticks Blvd. community

This week's BWL column highlights the recent celebration of the completion of the Fiddlesticks Blvd. shared use path, and what other communities can learn from this project's long journey to successful completion.  Thank you to the many people who made this project happen!  Be sure to let the officials, staff, and community advocates know that you appreciate this project.  During the holiday break,  plan to get on your bike or put on your running shoes to try out the new path, which connects to the extensive path system on Daniels Parkway and beyond. Click here to see BWL's full photo album from ribbon-cutting event.

 BikeWalkLee's Column in News-Press "Go Coastal" section: 12/22/16
Dec. 8th Ribbon-Cutting Ceremony (L to R: David Murphy (David Murphy, Andy Getch, Matt Spielman, Christine Deramo, Antionette Johnson, Doug Meurer, Darla Letourneau, Commissioners Pendergrass, Pat Connor, and Ray Gonzalez)

What does it take for a neighborhood to improve its biking/walking infrastructure?

Tireless champions, a committed community and patience… lots and lots of patience.

That’s the lesson from the Fiddlesticks Boulevard Shared Use Path, which marked its opening with a county-sponsored ribbon cutting Dec. 8.

For background: Fiddlesticks Boulevard is a road leading off Daniels Parkway to four major communities totaling some 5,000 residents. Like so many thoroughfares around here, the road was flat, fast and potentially fatal to walkers and bikers alike.

Enter the dedicated champions, Ben and Kelly Bishop, who moved to one of the communities in 2004 and quickly committed themselves to improving the bike/walk safety of the boulevard. While requests for improvements had been made before, no sign of widespread support was ever in evidence. (Patience…)

That soon changed. The Bishops worked with the four Fiddlesticks communities to get their associations to sign on to supporting bike/ped improvements with county officials. With the larger circle of community champions, the project gained momentum to move it on to the county’s five-year Capital Improvements Project budget. Due to the backlog of requests, such projects usually can hope to be funded only at the end of that CIP cycle. (More patience…)

Possible improvements to the boulevard were suggested, from “share the road” signs to sidewalks and more. But community support and pressure resulted in a county commissioner-convened community meeting in 2012 where residents turned out in force to push for a shared use path – a wider, more useful and more expensive solution. (More patience…)

County officials saw the strong support as reason to agree to a higher priced shared use path. The design phase turned up some new issues, necessitating changes and additional permitting. (More patience…)
Ben and Kelly Bishop committed themselves to improving the bike/walk safety of Fiddlesticks Boulevard.
However, the many community champions monitored the project progress closely, calling on residents to turn out when necessary to show just how strong the neighborhood support continued to be. This, in turn, kept county officials engaged and enabled obstacles to be overcome to keep the project on track. (Just a little more patience…)

Permits and plans finally in hand, the county awarded the construction contract in June 2016… and six months later, everyone gathered on a December afternoon about two weeks ago to celebrate a project well done, with a ribbon-cutting ceremony hosted by District 2 Commissioner Cecil Pendergrass.

The new path connects the Fiddlesticks Boulevard communities to the Daniels Parkway path, and from there to the larger county bike/walk network. Residents can now ride or walk to shops and more in safety… they could even ride to the spring training games just up the road and cruise past all those cars stuck in all that traffic.

Congratulations to everyone who helped bring this project to fruition, adding another crucial connection to the bike/walk network.

Other communities can learn from this, of course. Want to make your neighborhood safer to bike and walk?
  • Identify a need and propose a  specific project.
  • Have a community champion willing to hang in there to the end.
  • Build and maintain community support start to finish (however long it takes).
  • Learn the county process and players to get things started and keep things moving.
  • Be there for the long haul, with patience to spare.
-- Ken Gooderham writes this on behalf of BikeWalkLee, a community coalition raising public awareness and advocating for complete streets in Lee County — streets that are designed, built, operated and maintained for safe and convenient travel for all users: pedestrians, bicyclists, motorists, and transit riders of all ages and abilities. Information, statistics and background online at www.BikeWalkLee.org

Biking, walking to happier holidays

While we always encourage people to enjoy the plentiful opportunities to bike, walk and run in Southwest Florida, holidays are an especially excellent time to hit the trails and paths.
Why?
  • To create family-friendly moments. Biking and, in particular, walking is something almost all of your family and visitors can do… so you can do it together.
  • To give everyone a little space. Getting on each other’s nerves? Get out and go for a walk or ride… it breaks up the routine and break downs some of the bad family habits we all can fall prey to.
  • To burn off some calories. Even the most prudent among us can partake a little too festively this time of year. Moving around is still the best remedy to too much food… so get moving!
  • Finally, to beat the traffic. The week between holidays is often approaching gridlock on our roads… but not necessarily on our paths. Would you rather be stuck in traffic, or pedaling by it?
Enjoy your holidays – and any walks or rides you can fit in.

Ready to ride or run?

Run: There’s a break in organized events with the holidays coming, so you’ll need to find friends and family (or too much food) to keep you motivated to move. You can celebrate the new year with a 5K and plunge in Naples (gcrunner.org), or keep in training for the River Roots & Ruts Half Marathon/5K on Jan. 8 (ftmyerstrackclub.com)

Ride: Celebrate New Year’s Eve early with Critical Mass, with a night ride Dec. 30 in Cape Coral, a morning ride in Fort Myers on Dec. 31, and the original CM downtown ride Jan. 6 Details and RSVP at http://www.meetup.com/Biking-SWFL/events.

Both: The HITS tri series returns to Naples on Jan. 7-8 with distances for everyone, from the short Open to the full Ironman (hitstriathlonseries.com/naples-fl)

Friday, December 2, 2016

BPAC sends letter to County Commissioners in support of TIGER wayfinding project

Kudos to BPAC for its letter of support for the TIGER grant wayfinding project, currently under development by the Lee MPO.
Last month the County's Bicycle/Pedestrian Advisory Committee sent a letter to County Commissioners voicing its support for the TIGER grant wayfinding project.  The Committee's letter states: "We would like to express our support for the wayfinding project. We believe wayfinding signs will be an excellent advertising tool to educate citizens of our bicycle/pedestrian facilities, will encourage more people to use these facilities as intended, and will increase traffic to area parks and local businesses."

BPAC's letter also thanks the Board for increasing the budget for bike/ped retrofits to $2 million/year in the CIP budget for FY 2016/17-2020/21, as requested by the Committee in 2014.

Click here to read the full BPAC letter.


 Letters of support for the project were also sent in May by the Lee MPO Board's Executive Committee and FDOT District 1 Secretary.


Tuesday, May 3, 2016

County Commissioners proclaim May Bike Month

Thanks to Lee County Commissioners, its Bicycle Pedestrian Advisory Committee, and LeeDOT staff for working to declare May Bike Month. In his remarks, BPAC Chair Don Mayne stated that over the past year the committee had looked at 17 bike/ped facility requests (with 40 citizens participating in those requests) and added 13 projects to the approved BPAC list.  He noted that only one project was constructed last year, and thanked the BoCC for recently adding more funds in next year's budget for BPAC projects.
BPAC members (3 in middle--Chair Don Mayne, David Wheaton, Pat Connor) along with LeeDOT staff (David Wagley and Andy Getch)
 Below is the proclamation adopted by the Commissioners:



Wednesday, January 20, 2016

BWL Column: Villas volunteer helps pave way for sidewalks

This week's BWL column is by Jane Bowser, a resident of the Villas south of Fort Myers, telling her story about how one person can help make a neighborhood safer for walking and biking.  Read it and be inspired to get involved.
BikeWalkLee Column in News-Press "Go Coastal" section, Jan. 21, 2016 
By Jane Bowser
BikeWalkLee Note - Most people who get involved in making Southwest Florida a safer and more accessible place for people to walk and bike often come by their involvement through a specific project in their community, or as a result of a tragedy that prompted them to make our community safer. Today's column is the story of just one of those accidental advocates – Jane Bowser.



Lee County biking and walking facilities continue to grow each year, and I wanted to highlight one of the new sidewalk projects that has recently been completed by the Lee County Dept. of Transportation (LeeDOT), in the Villas community, which is bounded roughly by U.S. 41, Crystal Drive, Ten Mile Canal and Big Pine Way south of Fort Myers. The story of how this project came about can give other communities in the county a sense of what's involved in getting biking and walking facilities in your community. Yes, it takes a village.

Often housing developments were built without adequate thought to the needs of people walking and biking both within their community and between their community and nearby destinations. This has given rise to a growing backlog of needed retrofit projects in already existing developments and communities to make their communities safe and accessible for people walking and biking. The Villas community (which was developed beginning in the late 1950s) was no exception.

More than 10 years ago, residents had petitioned the county for a sidewalk on the community’s main thoroughfare (Sunrise Boulevard), but nothing came of that request. Then in 2010, as part of the county's implementation of its 2009 Complete Streets policy, county staff undertook a review of local roads that were scheduled to be resurfaced that year to evaluate what was needed to make the street complete. As part of that review, sidewalks on two roads – Gorham Avenue and Crest Lane – in the Villas were recommended.

By a lucky coincidence, I happened to call LeeDOT about the need for sidewalks in the Villas just as plans were moving forward on the two streets identified as part of the Complete Streets review, and I was invited to attend a county Bicycle & Pedestrian Advisory Committee (BPAC) meeting to present the community's alternative sidewalk locations.

Children wait safely after sidewalks installed
The Villas Civic Association president at that time, my daughters and I attended that BPAC meeting, armed with only a petition signed by a few local residents who had attended our previous community meeting. We made it known that the community wanted safe passage for the children on Beacon Street from Sunrise Boulevard to Crystal Drive, and a sidewalk on Sunrise Boulevard connecting existing sidewalks so that people could walk to the community center safely.

A motion was made to change existing plan, and have surveys done. It passed unanimously. I was invited to come back to any future meetings if I desired. I secured a babysitter and did come to the next few meetings – and before long, I found myself being appointed to the BPAC!

Over time as the sidewalk plans unfolded,  some in the community were upset. A resident walked around to all of the houses on Sunrise with his own petition demanding the project be stopped, as he feared the sidewalks would be right on the property lines and come very close to front doors, trees would be lost, and pandemonium would surely ensue. To address community concerns, our district county commissioner came to speak at our next community meeting. I had never seen such a high turnout! Maps were passed around and fears subsided, the sidewalk would look like every other sidewalk in the community.
 community area that now has sidewalk access
As often happens when safe and accessible walking facilities are provided, more people are out walking and biking, which gives rise to other community facilities and activities. For instance, since the new sidewalks were installed in the Villas, the Civic Association has built a swing-set and teeter-totter at its property, which draws local residents and their children to play. The association also has plans to add more to the park as funding becomes available. The kids now have safe passage from the sidewalk on Sunrise to the intersection on Beacon to get to school, and safer places to stand while waiting for the bus.
New community swings after sidewalks installed

It took the effort of many, but will serve so many more. I am proud to have been one small cog in the process. I still serve on the BPAC committee and hope to for years to come.

Jane Bowser is a resident of the Villas south of Fort Myers and a member of the county Bicycle and Pedestrian Advisory Committee.

Ready to ride or run

Run: If you’re looking for a race, Jan. 30 is your day… with 5Ks in Fort Myers, North Fort Myers and Naples (all benefiting worthy causes), and a half marathon/5K that crosses the Peace River from Port Charlotte.

Ride: This weekend there’s a range of rides, walks and kids’ events at the TD Naples Bike Brunch at Lowdermilk Park. SW Florida Critical Mass has events ahead… in the Cape on Jan. 29, plus a starter ride in Fort Myers on Jan. 30 followed by the first-Friday ride Feb. 5.

Both: Sorry, nothing locally in triathlons for the foreseeable future.

#BeSeenLee: To keep people safe at night while biking, we’re working to provide free bike lights to those unable to afford them (but who have to ride at night). BikeWalkLee partners (including Pawnbroker Marketing and Billy's Bikes) will be coordinating events during this campaign. Be sure to watch the BikeWalklee Facebook and Twitter pages for more #BeSeenLee event announcements and details.

Ken Gooderham compiles this for BikeWalkLee, a community coalition raising public awareness and advocating for complete streets in Lee County — streets that are designed, built, operated and maintained for safe and convenient travel for all users: pedestrians, bicyclists, motorists, and transit riders of all ages and abilities. Information, statistics and background online at www.BikeWalkLee.org.

Monday, July 13, 2015

Estero citizens press for bike/ped facilities on Estero Parkway

Pressure is mounting in Estero for the County to fund the BPAC-recommended shared use path project for Estero Parkway.  Below are four stories in the media (2 NBC-2 News, one WINK News  and a Naples Daily News story) over the weekend about this project. Thanks to our Estero rep, Doug Saxton, for taking the lead on this project for BikeWalkLee.

At Friday's Estero Village Council workshop  and again at Monday's ECCL Transportation Committee meeting, citizens, including BikeWalkLee's Estero rep Doug Saxton, spoke about the need for a shared use path on Estero Parkway, a project that is ranked at the top of the County's BPAC recommended bike/ped funding priorities list.  While Estero Parkway is located in Estero, it is a county-managed roadway and as such, the County should pay for this project, as it does for other county-managed roads in other jurisdictions. In February, BPAC recommended that BoCC increase funding for retrofit projects to $2 M/year (more than double the current funding level), a request supported by BikeWalkLee.  If BoCC were to approve BPAC's request for $2 million/year, there would be funds available for the Estero Parkway project.

WINK News, July 13th: Push to make Estero Parkway safer

WINK News, July 13th: Push to make Estero Parkway safer

 http://www.winknews.com/2015/07/13/push-to-make-estero-parkway-safer/



ESTERO, Fla.- There is a push to make Estero Parkway safer for runners, walkers and bicyclists.
“We are trying to create bikeable and walkable community,” said Doug Saxton with BikeWalkLee.
Saxton knows firsthand how unsafe Estero Parkway can be.

“When I go from my daily run and I have to leave the sidewalk area, I have to go on that very small shoulder. The cars are zipping by you 45 plus and it’s definitely a concern,” Saxton told WINK News.

A sidewalk along the parkway ends with no warning, putting the bicyclist and or pedestrians on a tiny piece of road along a very busy street.

“It’s unfortunate that in order to live a healthy lifestyle, you have to take some risks,” said Saxton.
Saxton is worried with a new Wal-Mart opening soon and students returning to Florida Gulf Coast University this fall, the area will become even more dangerous.

Saxton is talking with Lee County about adding bike lanes and wider sidewalks. But, it will cost more than $1 million and the questions remain, who will pay for it and when will construction start?

“Right now, Estero parkway is high on that list, but they are unfunded.”

People in Estero will find out when the sidewalk and bike project will be in the works in September. That’s when Lee County finalizes its five year Capital Improvement Plan

NBC-2 News: Concerns grow about sidewalks near new Estero Walmart

Jul 12, 2015 7:38 PM EST
By David Hodges, Collier County reporter
ESTERO, FL -While residents are looking forward to the convenience of a new Walmart on US-41 and Estero Parkway, some worry the lack of sidewalks might create a dangerous situation.

"I'm a walking fanatic," Amy Spoerl said taking a stroll down Estero Parkway.

Spoerl's walk has to end or continue on the grass or road after just a couple miles. The sidewalk ends on the south side of the road right at the railroad crossing. It's not the only place where the sidewalk cuts off on that road.

"Sometimes I would have to go out on the road. It depends on what the grass is like. Has it been mowed lately? Did it rain a whole bunch? I don't know," Spoerl said.

Spoerl says the one thing for sure is that it's not the safest place to walk.

"I'm only a couple of feet away from cars traveling in excess of 45-50 miles per hour, so it's a little unnerving," BikeWalkLee representative Doug Saxton said.

Lee County has already seen 11 pedestrians and three bikers die in crashes in 2015.

Saxton says the real problem might surface when the Walmart opens later this summer and FGCU is back in session. Estero Parkway is the road that connects the two hubs.

"There's going to be a huge increase in traffic here," Saxton said.

Saxton recently approached the Lee County Bicycle/Pedestrian Advisory Committee about the need for a mixed-use path on the parkway.

BPAC has the project high on their priority list, but it's currently unfunded.

BPAC is asking Lee County Commissioners for a bump in their budget to help tackle several projects. The advisory members sent a letter requesting $2 million in funding. Current funding is around $750,000 a year.

The debate over who pays for the project is not over yet. Estero council members are courting Lee County to pay for several road and sidewalk projects. The two parties still haven't decided who will maintain Estero Parkway in the future.

In the meantime, Saxton says he'll just keep being careful about where he's walking.

"For now everybody really has to be careful about what they're doing," Saxton said.



 Jul 10, 2015 5:48 PM EST
By Brittany Weiner, Reporter

NBC-2.com WBBH News for Fort Myers, Cape Coral


ESTERO, FL -
Lee County is considered one of the deadliest in Florida for bicyclists and pedestrians. There have been more than 280 crashes so far this year. Fourteen of them were fatal. 

Estero residents have tasked their newly formed council to step up a safety on the roads. 
Many sidewalks in Estero don't connect.  Once you get to a point, you either have to go through grass or onto the busy road. 

When you live in a place where it's always summer, getting around on foot or by bike is always an option.
"The older we get, the more active we get," said Estero resident Adele Amico. 

"If everybody has their own space on the road, then we're all safe," said Doug Saxton with Bike Walk Lee. 
Doug Saxton is a representative for the safety advocacy group - Bike Walk Lee.  He says that space can be hard to find in Estero. 

"Parts of my run are on the shoulder of road literally feet from the cars," said Saxton.

There is a lack of sidewalks and bike paths, and many of them don't connect. 

"The tarred area stops, and then all of the sudden, you decided should I continue or I better turn around right now," said Amico. 

Residents asked the Village of Estero council to put safety on the top of its to-do list.

"We'd like to have a shared-use path; which is a wider sidewalk that will allow for bicyclists, runners, strollers or whatever it is to come and go safely," said Saxton.

Many people think Lee County should foot the bill for these improvements. 

"I think the county should be responsible because it is a county road.  It's an issue that happened prior to us becoming a city," said Amico.

"It shouldn't be taken over by the village until the conditions that are there are eliminated," said Estero resident Bill Williams.  

Councilors plan to put pedestrian and bike safety on the agenda for their September 3rd regular meeting.  


http://www.naplesnews.com/news/local-government/push-on-for-sidewalks-along-estero-parkway_50349221

Naples Daily News, July 10, 2015: Push on for sidewalks along Estero Parkway
By Maryann Batlle
Photo submitted to NDN by Bill Williams
A road that leads to Estero’s soon-to-be-open Walmart needs sidewalks, the village council said Friday, but Lee County should probably pay for them.

Mayor Nick Batos said residents should support the council’s negotiations with the county instead of breaking off into lobbying factions.

“Everybody has the opportunity and the right to have discussion and bring up their idea,” Batos said. “If we don’t consolidate our efforts in one path, then we (can) confuse the issue.”

Two residents who spoke during a Friday council workshop asked the village to endorse community-led efforts to twist the county’s arm on the Estero Parkway issue. They brought up their concerns as the village council debated how best to prioritize capital improvement projects such as median beautification, road paving and, yes, sidewalks.

Bill Williams, who said he is a retired city manager, gave the village councilors packets of research with aerial photos taken from someone’s private photography drone. Williams is the head of an Estero volunteer citizens’ transportation committee that met Tuesday for the first time.

The looming grand opening of Walmart on Estero Parkway’s U.S. 41 corner is bringing the problem to a head, Williams said.

“We believe Lee County should step up,” Williams said. “Estero Parkway today is rapidly becoming a busy arterial. We need sidewalks.”

The drone aerial images show that weathered strips of concrete line the south side of Estero Parkway, in front of the Cascades gated community. The sidewalk ends long before Three Oaks Parkway to the east.

The north side of Estero Parkway also has sidewalk gaps. There is no sidewalk from the Osprey Cove community to the Walmart Supercenter under construction on U.S. 41.

Lee County estimates that building sidewalks on Estero Parkway would cost about $1.3 million, said Batos.
County officials have told Estero that the sidewalk project is a No. 1 priority, but Lee lacks funding to start construction, said Batos.

After the sidewalk discussion and a short break, Estero’s village council crunched numbers during its first budget workshop.

Revised budget figures show Estero is expected to bring in $10.9 million in revenue, interim Village Manager Peter Lombardi said.

He recommends that Estero keeps its property tax rate at .84 cents per every $1,000 of taxable value. Though the rate would stay flat, the proposal is tantamount to a tax increase because village property values are on the rise.

The council can cut expenses by lowering village employees’ salaries and benefits, said Estero resident Adele Amico.

“I think we need to start coming in line with reality,” Amico said.

Saturday, May 30, 2015

BikeWalkLee comments to BoCC on its "growth increment funding" budget proposal

The FY 2015-16 budget process has begun in Lee County. At the Board of County Commissioners' meeting on June 2nd, they will consider a proposal to set aside some of next year's general fund budget for transportation. BikeWalkLee shared its views on this proposal in a May 29th letter (see below).
 
FY 2015-16 Budget Process
The next important date is June 16th, when the Board will hold a workshop (no public comment allowed) to discuss the draft FY 2015-16 budget.  This document should be made available to the public prior to the 6/16 workshop. The Board will set the millage rate on August 4th, and then hold a second budget workshop (again no public comment allowed) on the final draft budget on August 18th.  The two formal public hearings on the budget (required by state law) will be held on Sept. 9th and Sept. 23rd.  Prior to that, the only opportunity for public comment on the draft budget will be at the regular BoCC meetings on Aug. 4th and 18th (at the end of those meetings under either "Public Presentation of Matters by Citizens" or "Public Comment on Work Session" agenda items).  The public can always communicate its views to Board members in letters, phone calls, and meetings throughout the process.

BoCC members:
 John Manning: dist1@leegov.com, 533-2224
Cecil Pendergrass: dist2@leegov.com, 533-2227
Larry Kiker: dist3@leegov.com, 533-2223
Brian Hamman: dist4@leegov.com, 533-2226
Frank Mann: dist5@leegov.com, 533-2225


May 29, 2015
Dear Commissioners:

BikeWalkLee, a coalition working to complete Lee County's streets, works for a balanced multi-modal transportation system that values transportation choice, connectivity, economic opportunity, livable communities, community character, safety, and quality growth.  
On June 2, you will be considering staff's "growth increment funding" proposal, and BikeWalkLee would like to communicate its views in advance of your deliberations.  Those views are:
  •  If the Board plans to use some of next year's general fund budget for transportation, a significant portion of these funds should be dedicated to bike/ped retrofit projects and transit funding. 
  • All road projects in the CIP should be designed with a complete streets approach in an effort to improve the safety for all road users. 
  • Finally, we recommend that you act now to restore impact fees to the 100% rate. 
The Board is being asked to provide policy direction for development of this year's draft continuation budget.  The staff's "growth increment funding" proposal is simply a methodology for arriving at a dollar amount to earmark in the budget process from general fund (which comes from property taxes) for infrastructure projects.  In reality, this proposal is simply filling the hole created by the loss of impact fee revenues.  The proposal shows $7.9 million being earmarked for that purpose next year--filling the estimated $7 million/year hole created by your 55% reduction in road and park impact fees collection rates.

As we stated throughout the impact fee debate, we supported the county's 25-year policy that growth should pay for growth and warned that if developers were not charged the full cost of the infrastructure necessitated by that development, the taxpayers would be picking up the tab.  Your proposal makes that scenario a reality-- the shortfall in impact fee revenues would now be paid for with property taxes.

BikeWalkLee agrees that additional funds are needed to implement multi-modal transportation projects and retrofit dangerous conditions for users. We also believe that, in some instances, the general fund is appropriate for these purposes.  For example, a $2 million/year allocation would allow the Board to fully fund the recent BPAC request for stand-alone bike/ped retrofit projects to attack the extensive backlog of 85 approved and prioritized projects (totaling $68 million).  Lee County ranks as one of the most dangerous areas in the country for pedestrians and cyclists and it's important that our elected officials take actions to make our roads safer. 

For the past four years, we have been highlighting the new fiscal realities in the transportation world--the transportation funding of the past has been reduced at all level of government and isn't coming back.  Given this new reality, local governments must figure out how to maximize their local revenues for transportation and best invest these dollars to maximize the benefits.

Unfortunately, during the impact fee debates over the past two years, the Board ignored this fiscal reality and drastically cut impact fees. Impact fees are one of the three main sources for transportation funding in Lee County--the other two (almost equal) sources are tolls and gas taxes.  When we pointed out that the out-year costs of the Board's approved 5-year transportation CIP was significantly underfunded, the response was that "the CIP is balanced" so these road impact fee dollars were not needed.  It's regrettable that the truth about the transportation funding needs was not part of the impact fee debate so that the consequences of forgoing these revenues could have been considered before the decision was made to continue a significant reduction in collection of the full costs of public infrastructure investments necessitated by new development.  For road impact fees alone, the 5-year loss due to the Board's policy decisions is an estimated $33 million.

The "growth increment funding" proposal does nothing to address the larger transportation funding deficit, which staff estimates to be $400 million.  The only reasonable next step to address this shortfall would be to restore the impact fees to the 100% collection rate.  While these two steps (the incremental growth proposal and restoring impact fees to 100%) will clearly not fully fund the transportation deficit, it would put the county on a path to a longer term solution. The reality is there are no additional federal or state funds that are going to come bail us out, as Commissioner Kiker suggested at the March 19th BoCC workshop.  The federal Highway Trust Fund is broken and Congress has clearly demonstrated it is not capable of addressing our nation's infrastructure funding crisis.  Likewise, Gov. Scott has made it clear that he's not planning to raise revenues to deal with the state's transportation funding needs, as some other states have done.  So, that leaves it up to each community to find ways to address this problem-- by astutely maintaining available local revenues and by spending those revenues as smartly and cost-effectively as possible.  The only fiscally responsible approach is to equitably maximize the revenue sources available to the county.

A missing piece in this discussion is the other important part of the transportation system--transit. To increase the economic competitiveness of Lee County, reduce overall transportation costs, and increase our quality of life, we need a healthy transit system.  Research shows that you can't build your way out of congestion, i.e. more road lanes brings induced demand, putting more cars on the road.  A multi-modal system is the only viable option to save money in infrastructure costs and manage congestion in a crowded future. 

As the Board considers spending some general funds for infrastructure needs, it should also be increasing general fund expenditures for LeeTran operations.  The county should be proactively preparing to meet the future demand of a population projected to grow to over 1 million by 2040. LeeTran services were cut back in 2013-14 and, while funds were restored in last year's budget, damage was done to the system's viability. As a result of these cutbacks, transit became a less reliable means of travel to work or other essential destinations.  Investments in public transportation are the fiscally responsible way to meet the transportation needs of a growing area such as Lee County.

In summary, if the Board plans to use some of next year's general fund budget for transportation, a significant portion of these funds should be dedicated to bike/ped retrofit projects and transit funding.  Further, all road projects in the CIP should be designed with a complete streets approach in an effort to improve the safety for all road users.  Finally, we recommend that you act now to restore impact fees to the 100% rate. 

Thank you for considering our views.

Sincerely,
 
Darla Letourneau
on behalf of BikeWalkLee
------------------------------------------------------------------------------------------------------------
 Recent Letters to BoCC on topic:



Jan. 29, 2015: BikeWalkLee letter to BoCC opposing extension of impact fee reductions