Showing posts with label budget. Show all posts
Showing posts with label budget. Show all posts

Friday, September 9, 2016

BikeWalkLee comments on County Commission's proposed transportation plan in the FY 2016-17 budget

 It's budget time again, and BikeWalkLee communicated its comments on the County's proposed 2016-17 budget to the County Commissioners for their consideration during the September public comment period.  Below are highlights of our recommendations, and a link to the complete BWL letter which contains detailed comments and recommendations on each of these four topics, along with a link to the draft detailed CIP.


September 8, 2016
Dear Commissioners:

BikeWalkLee, a coalition working to complete Lee County's streets, works for a balanced multi-modal transportation system that values transportation choice, connectivity, economic opportunity, livable communities, community character, safety, and quality growth.

On September 5, prior to the Sept. 6th public hearing, we sent you our letter with comments on the proposed 2016-17 budget.  On Sept. 6th, we received an email (also sent to the Board) from Assistant County Manager Pete Winton, stating that there was an error in the "Bicycle Pedestrian Facilities" line item in the County's detailed CIP table that he provided to BikeWalkLee for its analysis.  We have now revised our recommendations based on this corrected County information, and are submitting this revised letter for your consideration as you finalize the proposed 2016-17 budget.

Here are the highlights of our recommendations
1. Bike/Ped Facilities
  • Begin planning now for increased investments in bike/ped facilities in next year's five-Year CIP to build on the federal investments of the Lee MPO TIGER Complete Streets Initiative grant.
  • Push for completion of already funded projects in a more expeditious timeframe.
2. CIP Road Projects
  •  Demonstrate your commitment to accelerate the schedule for the completion of the Estero Blvd. Improvement project within the 5-year CIP, by moving the $19.5 million now shown in the outyears (years 6-10) into the 5-Year CIP Plan. The Board's decision to delay the Hickory Bridge projects ($33.8 million originally planned for FY 21-22) to the outyears, means that there are projected revenues available NOW that can be budgeted for the Estero Blvd. project. While the County Manager's memo states the change of the bridge projects "will allow for potential acceleration of Estero Blvd.," without including funds in the 5-year window for this purpose, there is no commitment to accelerate this project.
3. Transit
  • Before next year's budget cycle, develop public transportation options for the growing workforce and projected county population by ensuring (and funding) a robust transit system with frequent and reliable service.
  • In the coming year, implement low-cost and innovative measures to increase ridership, learning from other successful communities.
4. Public participation in budget process
  • Provide complete, accurate, accessible, and timely information to the public on the budget proposals under discussion throughout the budget process.
  • Provide an opportunity for the public to comment during Board workshops on budget issues.
Click here to continue reading BikeWalkLee's letter, which includes details on each of these four topics. Click here to view the County's detailed draft transportation CIP (as of 9/12/16).  Note that it does not yet reflect the BoCC's decision to pay 100% of the cost of the Estero Parkway Project.







Friday, August 28, 2015

BikeWalkLee's letter to Lee BoCC on county's proposed 2015-16 budget

It's budget time again, and BikeWalkLee has communicated its comments on the County's proposed 2015-16 budget to the Lee BoCC in advance of the September public hearings (see below).  For information on the schedule of upcoming public budget hearings, click here.  Take the time to communicate with your elected officials about what public investments are most important to you.


August 28,  2015


BikeWalkLee, a coalition working to complete Lee County's streets, works for a balanced multi-modal transportation system that values transportation choice, connectivity, economic opportunity, livable communities, community character, safety, and quality growth.   As the Board prepares to take public input in September about its proposed 2015-16 budget, BikeWalkLee would like to share its comments for your consideration. 

Here are the highlights of our recommendations:
1.  Transit--Adopt the proposed modest increases to the LeeTran budget, and commit to addressing the larger need for a more robust transit system in the coming year.
2.  Bike/Ped Facilities--Fully fund the BPAC request for $2 million a year for retrofit projects by adding another $3.9 million to the 5-year  CIP for this line item.
3. Transportation CIP--Delay the Alico Rd. widening project and shift those funds into the Board's #1 priority project-- Estero Blvd. Improvement project--so that it can be constructed in a shorter timeframe (currently planned to take 10 years).
4.  "Growth Increment Funding"--Announce your plans for the use of these funds and the process by which those decisions will be made prior to the September public budget hearings.
5.  Deepwater Horizon Oil Spill Settlement Funds--Announce your plans for the process and timeframe for deciding how to allocate the $5.24 million, and consider allocating these funds for bike/ped projects.

Transit
BikeWalkLee has long advocated for a robust transit system as part of a balanced multi-modal transportation system. We are pleased to see that the proposed budget continues the restoration of services that had been cut in the FY 2014 budget, maintains the three bus route improvements that began in January (with revenues from the increased fares), and provides an additional $600 K for improved ADA transit and transportation disadvantaged service.  We were also pleased to see the improvements to Route 60, serving FGCU and San Carlos Park, implemented beginning last month.  We also urge you to ensure that the Fort Myers Beach "Park and Ride" service continues without disruption while the county develops a new parking facility. BikeWalkLee’s concern has been that the 2014 cuts to transit services resulted in ridership losses that are difficult to rebuild. The dependability and convenience of transit must be addressed. The County can do this by further improving headways throughout the system, enhancing the rider experience, and aggressively marketing the benefits of transit. 

While we support the County's transit budget proposals, they only tinker at the edges of what is needed to meet the long term needs of our community. The county should be proactively preparing to meet the future demand of a population projected to grow to over 1 million by 2040. As the Bonita Springs' Chamber of Commerce President Christine Ross' recent article, Our Region's Transportation Conundrum, Let's Tackle Transit, stated, it's past time for the county to provide public transportation options for the growing workforce.  Having a robust transit system--one that has frequent and reliable service--that attracts "choice" riders, not just a transit system viewed as a "social service"--is critical to Lee County's economic competitiveness.  In the coming year, we urge the Board to partner with the Lee MPO and other communities and businesses throughout SWFL to seriously commit to a reliable and convenient transit system.

Bike/Ped Facilities
As we stated in our March 9, 2015 letter to you, we wholeheartedly support the BPAC request for $2 million a year for stand-alone bike/ped retrofit projects to attack the extensive backlog of 85 approved and prioritized projects (totaling $68 million). While your proposed budget for this line item represents an increase over last year's plan, it still falls $3.9 million short of what is needed to fully fund BPAC's request, and only funds 5% of the needed projects (4 of 81 projects funded).  The next project on the BPAC prioritized list is for a shared use path on Estero Parkway, which is urgently needed for the safety of pedestrians and cyclists with the growth and development that is occurring along this county road.

We were pleased to see the Palomino Lane Shared Use Path project, which was approved by the Board in 2014, be fully funded in this year's budget.  Another important bike/ped facilities project off Daniels Parkway--the Fiddlesticks Rd. Shared Use Path--was approved in 2012 and was to start construction in 2014.  We hope that construction on this project, which has been delayed by permitting issues, will begin shortly.  With the new shared use path soon to be constructed on the Fiddlesticks side of Daniels Parkway as part of the MPO's $10 million TIGER Complete Streets Initiative grant, it will be important for both of these two side road shared use path projects to be completed and connect up with the Daniels pathway system. This will allow many local residents to walk and bike to shops, schools, parks, and other destinations in the area without having to drive their cars on this increasingly congested roadway.

As BikeWalkLee stated in its January 29, 2015 letter to you, we are pleased that the impact fee ordinance (adopted March 3, 2015) includes language broadening the definition of what road impact fee funds can be used for, making it a more multi-modal transportation approach.  We encourage you to use this new tool to ensure that bike/ped/transit facilities are incorporated into transportation projects designed to meet the infrastructure needs created by growth.  This will provide our citizens with more transportation choices and save the taxpayers money by building these needed facilities from the start vs. later expensive retrofit projects.

Transportation CIP

It is also important that all road projects in the CIP be designed with a complete streets approach in an effort to improve the safety of all road users.  We also encourage the County to give a higher priority to maintaining and improving the current roadway network vs. expanding road capacity, taking a "fix it first" approach to prioritizing the scarce resources.

Over the past three years, the Board has given priority to four road projects: Alico/Ben Hill widening; Estero Blvd. Improvement project; Burnt Store Rd. widening; and Homestead Rd. widening.  BikeWalkLee has consistently stated that funding for the Alico Rd. widening project is not justified at this time, especially in light of other much higher priority needs in terms of traffic demand.  The Estero Blvd. Improvement project is a much higher priority and should proceed at a much faster pace in order to minimize the economic disruptions that the planned 10-year construction timeframe will cause.  With Estero Blvd. being the only road through Fort Myers Beach--one of the county's tourist hot spots--the economic costs of delay in terms of lost tourism dollars, not to mention the disruption to Fort Myers Beach residents, from such a long time horizon for this project merits delaying other projects so that this one can be completed as quickly as possible.

More glaringly, we continue to be concerned that the County has an approved transportation CIP that has set in motion the expenditure of funds on a long list of projects for which there is a MAJOR shortfall in revenues projected to be available.  The County should be scaling back its plans to meet the available future revenues. By moving forward with grossly unrealistic funding assumptions in the form of the proposed CIP, the County is pushing off the hard choice of prioritizing projects.  This "head in the sand" approach will cost taxpayers a great deal of money for purchase of right-of-way and design studies for projects for which there are no funds to construct.  As has been made clear at all levels of government over the past 4 years, transportation revenues will continue to decline from all sources at all levels of government for the foreseeable future.   You, as our elected leaders, should be facing the fiscal reality and making tough choices, rather than hoping for a future solution.

As we have communicated with you on numerous occasions over the past 4 years, we believe that the county should be collecting 100% of the impact fees due so that the full cost of the infrastructure necessitated by development is paid for by those creating the growth rather than current residents.  Even with full impact fee collections, the county would be short revenues needed to meet the transportation infrastructure needs of the county, but it would significantly reduce the "hole" that is growing increasingly deeper.

"Growth Increment Funding (GIF)"
In our May 29, 2015 letter, we outlined our comments on the County's policy decision to earmark an estimated $7.9 million of general funds (already collected from property taxes) for infrastructure projects.  This proposal simply fills the hole created by the loss of impact fee revenues due to the Board's decision to continue significant reductions in impact fee collection rates (now a 55% reduction).  Since that policy was adopted, County Administration has notified the Board that construction costs are up 20%, meaning that the gap has widened even further.

To date, the County has not indicated how they plan to spend the GIF fund and what process it will use to make those decisions.  Will the funds be used for transportation projects, parks, county buildings, utility projects and/or jails?  Will the funds be added to the CIP budget and made part of the annual CIP review and decision-making process? Or, does the County intend to create a separate/new process for projects to be considered? If so, when and how will this be determined? Will the public have an opportunity to comment in advance on this approach?  Given that infrastructure projects are usually multi-year investments, how will these funds be committed for the outyears, if not through the normal CIP process?  We urge the Board to announce the plans for the use of these funds and the process by which those decisions will be made before the beginning of the September public budget hearings.

As we stated in our May 29, 2015 letter, we urge you to dedicate a significant portion of these GIF funds to bike/ped retrofit projects and transit funding.

Deepwater Horizon Oil Spill Settlement Funds
In mid-July, the Board accepted $5.24 million as part of the national $18.5 billion BP settlement for the 2010 disaster.  These funds, which are due to be distributed by the end of this year, can be spent on anything, according to the County's spokesperson.  Although the Board is not including these funds in its decisions on the 2015-16 budget, the allocation of these funds is clearly a budget decision that should be subject to public input.  We hope that you will announce shortly the plan, process, and timeframe for deciding how to allocate these funds.

In the meantime, BikeWalkLee would like to offer its suggestion that these funds be allocated for bike/ped projects.  As mentioned before, the backlog of retrofit projects  is extensive.  Use of these funds for small one-time capital expenditures is a good fit for a one-time revenue "windfall", since it won't require ongoing expenditures in the outyears.  If the County wishes to take a tourism approach to the use of these funds, there are two quick projects with great tourism benefits to consider--creating the long discussed trailhead for the 10 Mile Linear Trail, so that visitors and residents have a place to park and then bike the trail; and investing in wayfinding signs along the network of share use paths and bike lanes throughout the county, i.e., expanding the County's Tour de Parks and University Loop successful wayfinding signs to the whole system, thereby encouraging more people to bike for transportation and recreation.  We look forward to discussing these ideas with you further once you have announced your process for deciding how to spend the $5.24 million.

Thank you for considering our views.

Darla Letourneau
on behalf of BikeWalkLee

Related BWL letters to BoCC on various budget topics:
Transit:
April 10, 2014 BWL Letter (comments on 4/15 BoCC Agenda Items 4 and 10): LeeTran Park and Ride Facility for Fort Myers Beach Trolley
Bike/Ped Facilities:
April 15, 2014 BWL letter (comments on 4/15 BoCC Agenda items 4 and 10): Palomino Lane Shared Use Path CIP Project Proposal

CIP/Impact Fees
Aug. 18, 2014 Letter (Margaret Banyan): Comments on 2015 budget items (CIP, impact fees, transit, Conservation 20/20)

Thursday, August 27, 2015

Opportunities to participate in September public budget hearings


Here's your last opportunity to be heard before the FY 2015-16 budgets are adopted by local governments.  BikeWalkLee recently submitted a letter to the Lee BoCC with its comments on the 2015-16 budget.
Every September, local governments throughout Florida are holding their two required public budget hearings.  This is an opportunity to communicate with elected officials both on the County Commission and in each of the 6 local municipalities about your views on the how the government is spending your tax dollars and what public investments are most important to you.  If you are unable to attend the public hearings, you can always write or call your elected officials.

In addition to the required September public hearings, the Lee BoCC is holding its last budget workshop on Tuesday, Sept. 1st at 1:30 p.m. (County Chambers).  Note: that unlike other BoCC workshops where no public input is allowed, the agenda for this workshop includes an item at the end for public input.  Click here for the agenda package.
Click here for BikeWalkLee's Aug. 28, 2015 letter to BoCC with its comments on the 2015-16 budget.

Below is the schedule of September public budget hearings throughout Lee County:

Lee BoCC: 
Sept. 9th at 5:05 p.m.
Sept. 15th at 5:05 p.m.

Fort Myers:
Sept. 10th at 5:15 p.m.
Sept. 24th at 5:15 p.m.
Cape Coral:
Sept. 10th at 5:05 p.m.
Sept. 25th at 5:05 p.m.
Bonita Springs:
Sept. 10th at 5:01 p.m.
Sept. 21st at 5:01 p.m.
Estero:
Sept. 3rd around 5 p.m.
Sept. 16th around 5 p.m.
Sanibel:
Sept. 12th at 9 a.m.
Sept. 22nd at 5:01 p.m.
Fort Myers Beach:
No information available

Saturday, May 30, 2015

BikeWalkLee comments to BoCC on its "growth increment funding" budget proposal

The FY 2015-16 budget process has begun in Lee County. At the Board of County Commissioners' meeting on June 2nd, they will consider a proposal to set aside some of next year's general fund budget for transportation. BikeWalkLee shared its views on this proposal in a May 29th letter (see below).
 
FY 2015-16 Budget Process
The next important date is June 16th, when the Board will hold a workshop (no public comment allowed) to discuss the draft FY 2015-16 budget.  This document should be made available to the public prior to the 6/16 workshop. The Board will set the millage rate on August 4th, and then hold a second budget workshop (again no public comment allowed) on the final draft budget on August 18th.  The two formal public hearings on the budget (required by state law) will be held on Sept. 9th and Sept. 23rd.  Prior to that, the only opportunity for public comment on the draft budget will be at the regular BoCC meetings on Aug. 4th and 18th (at the end of those meetings under either "Public Presentation of Matters by Citizens" or "Public Comment on Work Session" agenda items).  The public can always communicate its views to Board members in letters, phone calls, and meetings throughout the process.

BoCC members:
 John Manning: dist1@leegov.com, 533-2224
Cecil Pendergrass: dist2@leegov.com, 533-2227
Larry Kiker: dist3@leegov.com, 533-2223
Brian Hamman: dist4@leegov.com, 533-2226
Frank Mann: dist5@leegov.com, 533-2225


May 29, 2015
Dear Commissioners:

BikeWalkLee, a coalition working to complete Lee County's streets, works for a balanced multi-modal transportation system that values transportation choice, connectivity, economic opportunity, livable communities, community character, safety, and quality growth.  
On June 2, you will be considering staff's "growth increment funding" proposal, and BikeWalkLee would like to communicate its views in advance of your deliberations.  Those views are:
  •  If the Board plans to use some of next year's general fund budget for transportation, a significant portion of these funds should be dedicated to bike/ped retrofit projects and transit funding. 
  • All road projects in the CIP should be designed with a complete streets approach in an effort to improve the safety for all road users. 
  • Finally, we recommend that you act now to restore impact fees to the 100% rate. 
The Board is being asked to provide policy direction for development of this year's draft continuation budget.  The staff's "growth increment funding" proposal is simply a methodology for arriving at a dollar amount to earmark in the budget process from general fund (which comes from property taxes) for infrastructure projects.  In reality, this proposal is simply filling the hole created by the loss of impact fee revenues.  The proposal shows $7.9 million being earmarked for that purpose next year--filling the estimated $7 million/year hole created by your 55% reduction in road and park impact fees collection rates.

As we stated throughout the impact fee debate, we supported the county's 25-year policy that growth should pay for growth and warned that if developers were not charged the full cost of the infrastructure necessitated by that development, the taxpayers would be picking up the tab.  Your proposal makes that scenario a reality-- the shortfall in impact fee revenues would now be paid for with property taxes.

BikeWalkLee agrees that additional funds are needed to implement multi-modal transportation projects and retrofit dangerous conditions for users. We also believe that, in some instances, the general fund is appropriate for these purposes.  For example, a $2 million/year allocation would allow the Board to fully fund the recent BPAC request for stand-alone bike/ped retrofit projects to attack the extensive backlog of 85 approved and prioritized projects (totaling $68 million).  Lee County ranks as one of the most dangerous areas in the country for pedestrians and cyclists and it's important that our elected officials take actions to make our roads safer. 

For the past four years, we have been highlighting the new fiscal realities in the transportation world--the transportation funding of the past has been reduced at all level of government and isn't coming back.  Given this new reality, local governments must figure out how to maximize their local revenues for transportation and best invest these dollars to maximize the benefits.

Unfortunately, during the impact fee debates over the past two years, the Board ignored this fiscal reality and drastically cut impact fees. Impact fees are one of the three main sources for transportation funding in Lee County--the other two (almost equal) sources are tolls and gas taxes.  When we pointed out that the out-year costs of the Board's approved 5-year transportation CIP was significantly underfunded, the response was that "the CIP is balanced" so these road impact fee dollars were not needed.  It's regrettable that the truth about the transportation funding needs was not part of the impact fee debate so that the consequences of forgoing these revenues could have been considered before the decision was made to continue a significant reduction in collection of the full costs of public infrastructure investments necessitated by new development.  For road impact fees alone, the 5-year loss due to the Board's policy decisions is an estimated $33 million.

The "growth increment funding" proposal does nothing to address the larger transportation funding deficit, which staff estimates to be $400 million.  The only reasonable next step to address this shortfall would be to restore the impact fees to the 100% collection rate.  While these two steps (the incremental growth proposal and restoring impact fees to 100%) will clearly not fully fund the transportation deficit, it would put the county on a path to a longer term solution. The reality is there are no additional federal or state funds that are going to come bail us out, as Commissioner Kiker suggested at the March 19th BoCC workshop.  The federal Highway Trust Fund is broken and Congress has clearly demonstrated it is not capable of addressing our nation's infrastructure funding crisis.  Likewise, Gov. Scott has made it clear that he's not planning to raise revenues to deal with the state's transportation funding needs, as some other states have done.  So, that leaves it up to each community to find ways to address this problem-- by astutely maintaining available local revenues and by spending those revenues as smartly and cost-effectively as possible.  The only fiscally responsible approach is to equitably maximize the revenue sources available to the county.

A missing piece in this discussion is the other important part of the transportation system--transit. To increase the economic competitiveness of Lee County, reduce overall transportation costs, and increase our quality of life, we need a healthy transit system.  Research shows that you can't build your way out of congestion, i.e. more road lanes brings induced demand, putting more cars on the road.  A multi-modal system is the only viable option to save money in infrastructure costs and manage congestion in a crowded future. 

As the Board considers spending some general funds for infrastructure needs, it should also be increasing general fund expenditures for LeeTran operations.  The county should be proactively preparing to meet the future demand of a population projected to grow to over 1 million by 2040. LeeTran services were cut back in 2013-14 and, while funds were restored in last year's budget, damage was done to the system's viability. As a result of these cutbacks, transit became a less reliable means of travel to work or other essential destinations.  Investments in public transportation are the fiscally responsible way to meet the transportation needs of a growing area such as Lee County.

In summary, if the Board plans to use some of next year's general fund budget for transportation, a significant portion of these funds should be dedicated to bike/ped retrofit projects and transit funding.  Further, all road projects in the CIP should be designed with a complete streets approach in an effort to improve the safety for all road users.  Finally, we recommend that you act now to restore impact fees to the 100% rate. 

Thank you for considering our views.

Sincerely,
 
Darla Letourneau
on behalf of BikeWalkLee
------------------------------------------------------------------------------------------------------------
 Recent Letters to BoCC on topic:



Jan. 29, 2015: BikeWalkLee letter to BoCC opposing extension of impact fee reductions